Artillery Society

Cannon Construction...     Trail  | Hubs  | Felloes  | Pattern  | Barrel  | Wheels  | Carriage  | Tyres Part1  | Tyres Part2 |
| Metal Work  | Assembled Part1  | Assembled Part2  |

Home
6 Pounder Cannon
Our Cannon
The Society
Contact Us
Latest Events

Our Cannon's Construction...

The Tyres - Part 2

Wheels At New Workshop
Holes have been drilled through the tyre and felloes ready to be secured using large bolts and nuts. The bubblewrapped pattern can be seen propped against the wall in the background.


Tyre Counter Sinking
John countersinks the holes in the tyre to ensure the bolt heads lie flush with the tyre.


Wheel Nut
Coach bolts and nuts are used to secure the tyre to the wheel.


... Previous Page  |   Next Page ...